33 MW, about 66 MWh (2 hours, published by Harmony Energy Income Trust) in South Lancashire, Yorkshire and Humber. Everything on this page is read from published data for the 364 days to 16 October 2026, or is labelled as an estimate.

What it is

Power33 MW published by its owner; Elexon registers 40 MW
Storage duration2 hours published by Harmony Energy Income Trust
Charging zoneSouth Lancashire, Yorkshire and Humber
Connection siteWormald Green
Balancing mechanism unit2__FBPGM001

The power on this page comes from the owner. Harmony Energy Income Trust, which owned the battery when it was built, announced it on 12 September 2024 as 33 MW and 66 MWh, a two hour system. The capacity market and planning records also give 33 MW. Elexon registers the unit at 40 MW. Northern Powergrid's register probably shows the same battery, as Wormald Green Hybrid: 32.5 MW, connected on 18 September 2024, on a connection that allows 43 MW out and 33.2 MVA in, shared with a solar farm not yet built. Until February 2026 the meter agreed with the owner: no half hour above 34 MW sent out, and no single discharge above 59 MWh. From March it began to send out more in one go, and from 3 April more power: up to 36.7 MW, and on 12 June 2026 74.3 MWh in one three hour discharge, more than a battery of 33 MW and 66 MWh can deliver. No published document says what changed at the site. Until one does, the per kilowatt figures on this page are a little high for the months since April. Every per kilowatt figure on this site is worked from 33 MW. Read the announcement.

Who owns it and who trades it

Traded byBP Gas Marketing Limitedruns several sitesconfirmed, Elexon's register
Owned byHEIT WG LIMITED
Owner established fromcapacity market registered holder
UltimatelyHarmony Energy Income Trust (assets under Foresight Group) probable source

How we know. The HEIT SPV naming; the trust sold its assets to Foresight.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it is built from

Battery systemEnvision Energy, two hour liquid cooled
Entered operation2024-09 (energisation announced 12 September 2024)

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed. Checked 2026-08-30. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.

What it earned

Line364 days to 16 October 2026
Balancing mechanism£1.3m
Response and reserve auctions auction implied£731k
Capacity market£184k
Three lines together£2.2m

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 7,852 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 14 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 359 days to 11 October 2026, 45 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out32,052 MWh
Metered import, what crossed the meter in34,848 MWh
Equivalent full cycles, everything sent out over one full charge486 over 359 days, 494 a year at that rate
Apparent meter to meter efficiency92%, exceptionally efficient, or a short measurement period
Balancing offers accepted24,283 MWh
Balancing bids accepted16,956 MWh
Position outside balancing, export31,373 MWh
Position outside balancing, import41,495 MWh
Of which expected response delivery, net−955 MWh 3,576 out, 4,531 in
Traded position, net−9,167 MWh 30,238 out, 39,405 in
Traded position at the market index, sold£3.8m
Traded position at the market index, bought£3.1m
Traded position, net, at the index£669k
Response delivery, net, at the imbalance price−£146k −£121k at the index
Balancing and outside balancing together£1.8m £56.02/kW/yr

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £97.34. What it sent out was worth £125.24 a megawatt hour at that same index, 1.29 times the average. What it took in was worth £79.13, 0.81 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

What it paid to buy energy back

When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 16,956 MWh of accepted bids it paid an average of £87.65 a megawatt hour. The market index averaged £120.07 across those same half hours, so it bought back at £32.42 a megawatt hour below the going price.

Price it paidVolumeAverageCash
below zero648 MWh−£13.55£9k received
£0 to £25618 MWh£12.33£8k
£25 to £501,197 MWh£39.68£48k
£50 to £753,042 MWh£64.61£197k
£75 to £1005,059 MWh£87.63£443k
above £1006,391 MWh£125.17£800k

On 648 MWh the price was below zero: NESO paid this unit an average of £13.55 a megawatt hour to take energy, £9k in all. That is a constrained network with more generation on it than it can move.

The other direction, offers, is much smaller here: 24,283 MWh where NESO asked for more, paid at an average of £114.55 against an index of £82.97.

Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.

Where it stands

Balancing incomewhole fleet, £/kW/yr97th percentile100 units
Balancing incomeEngland and Wales peer group96th percentile72 units
Balancing income2.0 hour duration cohort95th percentile64 units
All three measured lineswhole fleet, £/kW/yr97th percentile230 units
Energy sent outhours at full power94th percentile98 units
Energy taken inhours at full power69th percentile98 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Welkin Mill332h£118.3/kW/yr
Wormald Green BESSthis battery332h£67.5/kW/yr
Rusholme351.5h£34.9/kW/yr
Atherton302.5h£32.7/kW/yr
Contego Battery362h£24.2/kW/yr
North Tawton BESS322h£13.0/kW/yr

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.