Since 10 October 2026: 4 batteries entered, 35 MW, 1 left, 14 other changes.

The Bundesnetzagentur publishes the whole Marktstammdatenregister as a daily export. It is read once a week for the storage units of a megawatt or more, every export is kept, and the difference printed, unit by unit. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.

2captures held across 1 list, the oldest from 10 October 2026
4batteries entered a list, 35 MW
1left a list
14other changes that moved something; 0 more were respellings or refilings

By month

MonthEnteredMW enteredLeftOther changesRespelt or refiled
October 2026435114·

Where this can be wrong

The register is filled in by operators and checked by grid operators, so an entry can change because an operator corrected it, because the grid operator did, or because the plant changed; the register does not say which, and the "grid operator check" column is the nearest thing to a signal. A unit that falls below a megawatt leaves this ledger without leaving the register. The first export is a baseline, not a report.

The whole ledger as a CSV.

The Marktstammdatenregister, batteries of a megawatt and up

A unit enters when it is registered at a megawatt or more and leaves when it is deleted from the register or falls below a megawatt; the export is read weekly, and a planned unit becoming an operating one shows as a change of status. 2 captures held, 10 October 2026 to 15 October 2026.

15 October 2026, against 10 October 2026

19 changes.

BatteryWhat changedFromToMWOur reading
UW_Visbek
SEE943914294755
entered··15new to this list
green flexibility BESS Ettringen gmbh
SEE959904987606
entered··10new to this list
ACDC ZW8
SEE926242887332
entered··5new to this list
BESS UW Vierlinden
SEE966521903452
entered··5new to this list
Speicher Kühbach IV - P24-064
SEE997803743657
left··3.4gone from this list
BESS Strübbel
SEE963514247548
grid operator checkunder checkchecked50changed
BESS UW Heessen
SEE978423585698
planned date2026-09-302026-10-2316changed
Pfaffenklinge Speicher
SEE912580321386
grid operator checkcheckedunder check8.8changed
Speicher Beilrode I - Teilanlage 5
SEE939346315557
net power, MW6.25.65.6down by 0.6
Batteriespeicher-Buch
SEE917146636904
grid operator checkunder checkchecked5changed
Batteriespeicher
SEE933255558609
planned date2026-09-172026-11-054.8changed
MM9 - Speicher - Parey
SEE919126258380
grid operator checkunder checkchecked3.5changed
Theilheim Speicher BA III Ino
SEE950334441102
net power, MW3.03.13.1up by 0.1
Theilheim Speicher BA III Ino
SEE950334441102
planned date2025-08-182026-10-193.1changed
BESS Sinzing
SEE921014163461
net power, MW3.43.03down by 0.4
BESS Sinzing
SEE921014163461
grid operator checkunder checkchecked3changed
Batteriespeicher 2
SEE942088999749
planned date2026-09-012026-12-302changed
Speicher Riesa Trst. Fertigung BA 4
SEE988302497264
planned date2026-10-312026-11-271.1changed
Batteriespeicher I-Kubus Quedlinburg
SEE911894016032
grid operator checkunder checkchecked1changed