1,049 MW of batteries are registered in the all-island market. 3,838 MW more hold a signed connection agreement and are not yet energised.
SEMO’s register of Oct 2026; EirGrid’s lists correct as of 5 August 2026; ESB Networks’ lists correct as of 1 July 2026. Read monthly and when they move.
Where the batteries are
One circle per battery, sized by capacity. Yellow is in the market; blue holds a connection agreement and is not yet energised.
64 of 73 batteries placed: 58 at a substation mapped in OpenStreetMap, 6 at the place GeoNames gives the name, 9 not placed. A market unit is placed by the place in its name, a contracted battery by its station; none of the registers prints coordinates.
Open the Atlas, every battery on the map What changed, capture by capture The system and every battery, right nowThree registers, read as published. SEMO, the operator of the all-island wholesale market, lists every unit in the market with its registered capacity and files 27 of them as battery storage, and one more is a battery it files as another fuel, added by hand with the evidence below: that is the fleet, on both grids and in both jurisdictions. EirGrid publishes every generator with a signed transmission connection agreement that is not yet energised, and ESB Networks the same for the distribution grid, with what it has energised. Nothing is estimated. A market unit’s figure is its registered capacity; a contracted battery’s is maximum export capacity (MEC), the connection, never the battery.
Every battery in the market
SEMO’s Registered Capacity report of Oct 2026, fuel type battery storage, with the month each unit registered from SEMO’s daily list. Where a unit is also on ESB Networks’ energised list the row names that entry; the two are one battery. One more energised battery on ESB Networks’ list, 0.4 MW, is not a unit in the market and is counted beside it, not in it. Golagh Battery is included by hand: SEMO files the unit as multi-fuel, but it is a 3 MW battery: the CRU authorised it as battery storage (Auth 2020/06-01, Barnesmore, Co. Donegal), Donegal planning 19/50357 consented it as a battery, and SEMO's own List of Registered Units of October 2024 gave it the fuel type BATTERY.
| Unit | Owner in the market | Jurisdiction | MW | Registered | ESB entry |
|---|---|---|---|---|---|
| Aghada BESS_02A | ESB | Ireland | 75 | Dec 2023 | |
| Poolbeg BESS | ESB | Ireland | 75 | Jun 2023 | |
| Aghada BESS_02B | ESB | Ireland | 75 | Jan 2024 | |
| Raghra 220KV | Shannonbridge Power (B) Limited | Ireland | 63 | Jul 2025 | |
| Lisdrumdoagh BESS | Statkraft Markets GmbH | Ireland | 60 | Mar 2022 | |
| Gorman BESS | SCOTTISHPOWER RENEWABLES (UK) LIMITED | Ireland | 50 | Feb 2022 | |
| Lumcloon ESS A-1 | Lumcloon Power Limited | Ireland | 50 | Oct 2024 | |
| Lumcloon ESS A-2 | Lumcloon Power Limited | Ireland | 50 | Oct 2024 | |
| Shannonbridge BESS (A1) | Shannonbridge Power Limited | Ireland | 50 | Sep 2021 | |
| Shannonbridge BESS (A2) | Shannonbridge Power Limited | Ireland | 50 | Sep 2021 | |
| Castlereagh BESS | Energia Customer Solutions NI Limited | Northern Ireland | 50 | May 2022 | |
| Drumkee Storage | Statkraft Markets GmbH | Northern Ireland | 50 | Mar 2021 | |
| Mullavilly Storage | Statkraft Markets GmbH | Northern Ireland | 50 | Mar 2021 | |
| Kells Battery Storage | Kells BES Ltd | Northern Ireland | 50 | Jun 2022 | |
| Southwall BESS | ESB | Ireland | 30 | Dec 2023 | |
| Kylemore BESS | ESB | Ireland | 30 | Mar 2022 | DG1821 |
| Porterstown BESS | Statkraft Markets GmbH | Ireland | 30 | Jul 2022 | |
| Kelwin Power Plant Phase 2 | Statkraft Markets GmbH | Ireland | 27 | Mar 2021 | |
| Cloncreen BESS | Cloncreen Wind Farm Supply DAC | Ireland | 25 | Aug 2024 | |
| Ballykilleen BESS | Statkraft Markets GmbH | Ireland | 20 | Jul 2025 | TG499 |
| Aghada BESS | ESB | Ireland | 19 | Dec 2021 | |
| Avonbeg Storage | Avonbeg Storage Limited | Ireland | 16 | Oct 2022 | DG1787 |
| Bannbridge Main | Heron Storage Limited | Northern Ireland | 12 | Oct 2024 | |
| BEEKTOBS | Statkraft Markets GmbH | Ireland | 11 | Apr 2020 | |
| Killala Battery Storage | Killala Community Windfarm DAC | Ireland | 11 | Mar 2022 | TG59B |
| Gorey BESS | Gorey Storage Limited | Ireland | 9 | Mar 2022 | DG1788 |
| GU_404510 | Statkraft Markets GmbH | Ireland | 8.5 | Mar 2021 | DG1679 |
| Golagh Battery Offline: declared 0 MW available to the market on every day from 11 July 2026 (SEMO average outturn availability). No reason has been published; ScottishPower holds consent for a repowering of the Barnesmore wind farm that would replace it with a 15 MW battery. | SCOTTISHPOWER RENEWABLES (UK) LIMITED | Ireland | 3 | Feb 2022 |
Arrivals, by the year a unit registered
| Year | Units | MW |
|---|---|---|
| 2020 | 1 | 11 |
| 2021 | 7 | 254 |
| 2022 | 10 | 309 |
| 2023 | 3 | 180 |
| 2024 | 5 | 212 |
| 2025 | 2 | 83 |
The owners with the most in the market
| Owner in the market | Batteries | MW |
|---|---|---|
| ESB | 6 | 304 |
| Statkraft Markets GmbH | 8 | 256 |
| Lumcloon Power Limited | 2 | 100 |
| Shannonbridge Power Limited | 2 | 100 |
| Shannonbridge Power (B) Limited | 1 | 63 |
| SCOTTISHPOWER RENEWABLES (UK) LIMITED | 2 | 53 |
| Energia Customer Solutions NI Limited | 1 | 50 |
| Kells BES Ltd | 1 | 50 |
| Cloncreen Wind Farm Supply DAC | 1 | 25 |
| Avonbeg Storage Limited | 1 | 16 |
What a contract means here
A contracted generator has signed a connection agreement with the system operator and is committed to exporting at a future date. That is a firmer thing than a place in Great Britain’s queue, where most of the capacity has no agreement at all. Ireland processes applications in batches under its Enduring Connection Policy, ECP-2.1 to ECP-2.5, and the batch each battery came through is in the table.
Contracted, by batch
| Batch | Batteries | MW |
|---|---|---|
| ECP-2.4 | 15 | 1,652 |
| ECP-2.3 | 9 | 666 |
| ECP-2.2 | 5 | 494 |
| ECP-2.5 | 5 | 411 |
| ECP-2.1 | 3 | 243 |
| ECP-2.5 Solar | 1 | 130 |
| T-4 2026/27 | 1 | 114 |
| ECP-1 | 3 | 74 |
| T-4 2028/2029 | 1 | 49 |
| ECP-2.3 - Non-Batch | 1 | 4.5 |
The stations with the most contracted battery capacity
| Station | MW contracted |
|---|---|
| Louth | 340 |
| Srananagh | 200 |
| Derryiron | 184 |
| Cashla | 180 |
| Blake | 180 |
| Kinnegad | 170 |
| Lodgewood | 169 |
| Kildinan | 156 |
| Thornsberry | 150 |
| Knockraha | 145 |
| Aghada | 130 |
| Arklow | 127 |
What is not here, and why
Who built each battery and whose cells are in it, because no register says; that is read battery by battery from what the owners and planners published, and arrives as it is found. Northern Ireland’s own connection lists, because SONI’s register and NIE Networks’ lists have moved since 2024 and have not yet been found at a stable address; its market units are here. What each battery earns, because the market’s unit data is not yet read. The 1,049 MW in the market and the 3,838 MW contracted are two lists that do not overlap by construction: a contracted battery leaves EirGrid’s list when it is energised and appears in SEMO’s when it registers.
Sources: SEMO, Registered Capacity report of Oct 2026 and List of Registered Units, from its public reports service, fuel type battery storage; SEMO filed batteries under that fuel type from its December 2025 report, and under multi-fuel before. EirGrid, Contracted TSO (Wind) and (Non-Wind) Generators, correct as of 5 August 2026; ESB Networks, Distribution Contracted and Energised Generators and Live Connection Assessments, correct as of 1 July 2026. Each PDF list is read into a table and checked against the total the list itself prints. Nothing on this page is modelled.