Vitreous LabsEnergy transparency
Ireland and Northern Ireland · the market register and the connection lists

1,049 MW of batteries are registered in the all-island market. 3,838 MW more hold a signed connection agreement and are not yet energised.

1,049 MWof batteries in the all-island market, 28 units, as SEMO registers them
212 MWof it in Northern Ireland, 5 units; the rest in Ireland
3,838 MWcontracted and not yet energised, 44 batteries, both grids
340 MWcontracted at one station, Louth, the most of any

SEMO’s register of Oct 2026; EirGrid’s lists correct as of 5 August 2026; ESB Networks’ lists correct as of 1 July 2026. Read monthly and when they move.

Where the batteries are

One circle per battery, sized by capacity. Yellow is in the market; blue holds a connection agreement and is not yet energised.

Ballysumaghan BESS & SC, 200 MWMonvallet Hybrid Solar and Battery Farm, 184 MWCoolcarrigan Solar, 180 MWKilmorna Energy Storage Facility, 170 MWTincurry Solar Farm, 169 MWDrumgoolan Solar and Battery Farm, 156 MWCoom Green Energy Park, 156 MWBallycosney Thornsberry Battery Storage, 150 MWLyrenacarriga Windfarm and BESS, 145 MWGarr Solar and Storage, 135 MWRathcoursey Solar Farm, 130 MWKish (Crag Wicklow), 114 MWDerryadd Wind Farm, 106 MWBarretspark Battery Storage, 100 MWBrownstown Solar and BESS farm, 100 MWFlagford Battery Storage, 100 MWKellistown Battery Storage, 100 MWTarbert BESS, 100 MWKilmannock Battery Storage Facility Ph2, 90 MWBracklyn Wind Farm, 90 MWBallymoneen Phase 2, 80 MWMidleton Battery Storage Facility, 80 MWTawnaghmore BESS, 80 MWNorth Arklow Solar Plus Storage, 77 MWMucklagh Battery Storage, 75 MWAghada BESS_02A, 75 MWPoolbeg BESS, 75 MWAghada BESS_02B, 75 MWBallyvouskil Battery Storage, 70 MWArdagh South Energy Storage, 60 MWBallymac, 60 MWPorterstown Battery Storage Ph.2, 60 MWTemplemichael Solar plus Storage Facility, 50 MWGorman BESS, 50 MWLumcloon ESS A-1, 50 MWLumcloon ESS A-2, 50 MWShannonbridge BESS (A1), 50 MWShannonbridge BESS (A2), 50 MWCastlereagh BESS, 50 MWMullavilly Storage, 50 MWKells Battery Storage, 50 MWBarrysbrook LDES, 49 MWRhode Energy Storage, 38 MWBooltiagh Energy Storage, 30 MWKilmannock Battery Storage Facility, 30 MWKylemore BESS, 30 MWPorterstown BESS, 30 MWColdwinters BESS (prev. Coldwinters Energy Hub), 25 MWCloncreen BESS, 25 MWBallykilleen BESS, 20 MWAghada BESS, 19 MWAvonbeg Storage, 16 MWBannbridge Main, 12 MWKillala Battery Storage, 11 MWGorey BESS, 9 MWGU_404510, 8 MWCarrowbeg Battery Storage, 7 MWDexcom Athenry Project, 6 MWBrianstown BESS (formerly Fisherstown BESS), 5 MWBallina Beverages Energy Centre, 4 MWGolagh Battery, 3 MWBarryscourt Solar Farm, 2 MWARCHITECTURAL AND METAL SYSTEMS, 1 MWRhode System Support Facility, 0 MW
In the market, or energised at distributionContracted, not yet energised

64 of 73 batteries placed: 58 at a substation mapped in OpenStreetMap, 6 at the place GeoNames gives the name, 9 not placed. A market unit is placed by the place in its name, a contracted battery by its station; none of the registers prints coordinates.

Open the Atlas, every battery on the map What changed, capture by capture The system and every battery, right now

Three registers, read as published. SEMO, the operator of the all-island wholesale market, lists every unit in the market with its registered capacity and files 27 of them as battery storage, and one more is a battery it files as another fuel, added by hand with the evidence below: that is the fleet, on both grids and in both jurisdictions. EirGrid publishes every generator with a signed transmission connection agreement that is not yet energised, and ESB Networks the same for the distribution grid, with what it has energised. Nothing is estimated. A market unit’s figure is its registered capacity; a contracted battery’s is maximum export capacity (MEC), the connection, never the battery.

Every battery in the market

SEMO’s Registered Capacity report of Oct 2026, fuel type battery storage, with the month each unit registered from SEMO’s daily list. Where a unit is also on ESB Networks’ energised list the row names that entry; the two are one battery. One more energised battery on ESB Networks’ list, 0.4 MW, is not a unit in the market and is counted beside it, not in it. Golagh Battery is included by hand: SEMO files the unit as multi-fuel, but it is a 3 MW battery: the CRU authorised it as battery storage (Auth 2020/06-01, Barnesmore, Co. Donegal), Donegal planning 19/50357 consented it as a battery, and SEMO's own List of Registered Units of October 2024 gave it the fuel type BATTERY.

UnitOwner in the marketJurisdictionMWRegisteredESB entry
Aghada BESS_02AESBIreland75Dec 2023
Poolbeg BESSESBIreland75Jun 2023
Aghada BESS_02BESBIreland75Jan 2024
Raghra 220KVShannonbridge Power (B) LimitedIreland63Jul 2025
Lisdrumdoagh BESSStatkraft Markets GmbHIreland60Mar 2022
Gorman BESSSCOTTISHPOWER RENEWABLES (UK) LIMITEDIreland50Feb 2022
Lumcloon ESS A-1Lumcloon Power LimitedIreland50Oct 2024
Lumcloon ESS A-2Lumcloon Power LimitedIreland50Oct 2024
Shannonbridge BESS (A1)Shannonbridge Power LimitedIreland50Sep 2021
Shannonbridge BESS (A2)Shannonbridge Power LimitedIreland50Sep 2021
Castlereagh BESSEnergia Customer Solutions NI LimitedNorthern Ireland50May 2022
Drumkee StorageStatkraft Markets GmbHNorthern Ireland50Mar 2021
Mullavilly StorageStatkraft Markets GmbHNorthern Ireland50Mar 2021
Kells Battery StorageKells BES LtdNorthern Ireland50Jun 2022
Southwall BESSESBIreland30Dec 2023
Kylemore BESSESBIreland30Mar 2022DG1821
Porterstown BESSStatkraft Markets GmbHIreland30Jul 2022
Kelwin Power Plant Phase 2Statkraft Markets GmbHIreland27Mar 2021
Cloncreen BESSCloncreen Wind Farm Supply DACIreland25Aug 2024
Ballykilleen BESSStatkraft Markets GmbHIreland20Jul 2025TG499
Aghada BESSESBIreland19Dec 2021
Avonbeg StorageAvonbeg Storage LimitedIreland16Oct 2022DG1787
Bannbridge MainHeron Storage LimitedNorthern Ireland12Oct 2024
BEEKTOBSStatkraft Markets GmbHIreland11Apr 2020
Killala Battery StorageKillala Community Windfarm DACIreland11Mar 2022TG59B
Gorey BESSGorey Storage LimitedIreland9Mar 2022DG1788
GU_404510Statkraft Markets GmbHIreland8.5Mar 2021DG1679
Golagh Battery
Offline: declared 0 MW available to the market on every day from 11 July 2026 (SEMO average outturn availability). No reason has been published; ScottishPower holds consent for a repowering of the Barnesmore wind farm that would replace it with a 15 MW battery.
SCOTTISHPOWER RENEWABLES (UK) LIMITEDIreland3Feb 2022

Arrivals, by the year a unit registered

YearUnitsMW
2020111
20217254
202210309
20233180
20245212
2025283

The owners with the most in the market

Owner in the marketBatteriesMW
ESB6304
Statkraft Markets GmbH8256
Lumcloon Power Limited2100
Shannonbridge Power Limited2100
Shannonbridge Power (B) Limited163
SCOTTISHPOWER RENEWABLES (UK) LIMITED253
Energia Customer Solutions NI Limited150
Kells BES Ltd150
Cloncreen Wind Farm Supply DAC125
Avonbeg Storage Limited116

What a contract means here

A contracted generator has signed a connection agreement with the system operator and is committed to exporting at a future date. That is a firmer thing than a place in Great Britain’s queue, where most of the capacity has no agreement at all. Ireland processes applications in batches under its Enduring Connection Policy, ECP-2.1 to ECP-2.5, and the batch each battery came through is in the table.

Contracted, by batch

BatchBatteriesMW
ECP-2.4151,652
ECP-2.39666
ECP-2.25494
ECP-2.55411
ECP-2.13243
ECP-2.5 Solar1130
T-4 2026/271114
ECP-1374
T-4 2028/2029149
ECP-2.3 - Non-Batch14.5

The stations with the most contracted battery capacity

StationMW contracted
Louth340
Srananagh200
Derryiron184
Cashla180
Blake180
Kinnegad170
Lodgewood169
Kildinan156
Thornsberry150
Knockraha145
Aghada130
Arklow127

What is not here, and why

Who built each battery and whose cells are in it, because no register says; that is read battery by battery from what the owners and planners published, and arrives as it is found. Northern Ireland’s own connection lists, because SONI’s register and NIE Networks’ lists have moved since 2024 and have not yet been found at a stable address; its market units are here. What each battery earns, because the market’s unit data is not yet read. The 1,049 MW in the market and the 3,838 MW contracted are two lists that do not overlap by construction: a contracted battery leaves EirGrid’s list when it is energised and appears in SEMO’s when it registers.

Sources: SEMO, Registered Capacity report of Oct 2026 and List of Registered Units, from its public reports service, fuel type battery storage; SEMO filed batteries under that fuel type from its December 2025 report, and under multi-fuel before. EirGrid, Contracted TSO (Wind) and (Non-Wind) Generators, correct as of 5 August 2026; ESB Networks, Distribution Contracted and Energised Generators and Live Connection Assessments, correct as of 1 July 2026. Each PDF list is read into a table and checked against the total the list itself prints. Nothing on this page is modelled.