Circle area is the megawatts; colour is how far along
Italy · projects by name · five public records
The ministry has 55.4 GW of storage waiting for a permit. At 30 April 2023 it had 1.6 GW. 5.9 GW got its decree in the year to 30 April 2026.
Terna’s queue never names a project. These five records do: the ministry’s report on the storage authorisations it handles, the regions’ own authorisation acts and notices, Terna’s capacity market and MACSE auction results, and what developers have said in public. Read together they give 746 named projects, 17 operating and 10 under construction. Every row says which record it rests on. The Atlas has the totals by municipality.
Showing every named project. Filter by stage, region or record, or search.
The projects, most advanced first
Click a row to centre the map there. MW is the developer’s or the ministry’s nominal figure; for a capacity market unit with no other record it is Terna’s CDP, a derated figure.
| Project | Company | Place | MW | MWh | Stage |
|---|---|---|---|---|---|
| Udine BESS 1 (Udine Sud) | Enel Libra Flexsys | Pavia di Udine | 204 | 805 | Operating |
| Codrongianos BESS 2 | Enel Libra Flexsys | Ploaghe | 138 | — | Operating |
| Pietrafitta BESS | Enel Libra Flexsys | Piegaro | 100 | 400 | Operating |
| La Casella BESS | Enel Libra Flexsys | Castel San Giovanni | 70 | 340 | Operating |
| Serre Tavazzano BESS | Enel Libra Flexsys | Tavazzano Con Villavesco | 50 | — | Operating |
| Montalto BESS 1 | Enel Libra Flexsys | Montalto di Castro | 44 | 176 | Operating |
| Porto Corsini BESS | Enel Libra Flexsys | Ravenna | 34 | — | Operating |
| Torrevaldaliga Nord ESS 2, 3 and 4 | Enel | Civitavecchia | 27 | — | Operating |
| Erchie BESS | Metlen | Erchie | 25 | 75 | Operating |
| Trino BESS 1 (Trino solar park and storage) | Enel Green Power | Trino | 25 | 100 | Operating |
| Nera Montoro BESS (Engie) | Engie Italia | Narni | 25 | 29 | Operating |
| Fusina BESS 1 | Enel Libra Flexsys | Venezia | 19 | — | Operating |
| Assemini BESS (Plenitude) | Eni Plenitude | Assemini | 15 | 9 | Operating |
| Montalto La Viola BESS | Recurrent Energy | Montalto di Castro | 14 | 43 | Operating |
| Salemi BESS (Engie) | Engie Italia | Salemi | 12 | 14 | Operating |
| Vicari BESS (ERG) | ERG | Vicari | 12 | 50 | Operating |
| Chivasso BESS (A2A) | A2A | Chivasso | — | — | Operating |
| Ottana BESS | Enel | Ottana | 200 | — | Under construction |
| Quartucciu BESS | Enel Libra Flexsys | Quartucciu | 180 | — | Under construction |
| Chignolo Po BESS | BW ESS | Chignolo Po | 107 | 515 | Under construction |
| Fiume Santo BESS 1 | TTEP Italia (formerly EP Produzione) | Sardegna | 100 | 200 | Under construction |
| Cerignola BESS (ACL SPV 7, BW ESS) | ACL SPV 7 Srl (BW ESS and ACL Energy) | Cerignola | 97 | 828 | Under construction |
| Porto Tolle BESS 2 | Enel | Porto Tolle | 25 | 100 | Under construction |
| Pasian di Prato BESS (Neoen) | Neoen | Pasian di Prato | 25 | 100 | Under construction |
| Carpi BESS 1 | Enel | Carpi | 21 | — | Under construction |
| Bertonico BESS (Sorgenia) | Sorgenia | Bertonico | 15 | — | Under construction |
| Broni BESS (Neoen, construction) | Neoen | Broni | 10 | 51 | Under construction |
| Enel Produzione MACSE lot 7 (Sud e Calabria) | Enel Produzione | Sud e Calabria | 574 | 3,636 | Contract awarded |
| Rondissone BESS | Aer Soléir | Rondissone | 250 | 1,000 | Contract awarded |
| ACL SPV 4 (MACSE, Sud e Calabria) | ACL SPV 4 Srl (ACL Energy; reported acquired by Enel) | Sud e Calabria | 227 | 1,425 | Contract awarded |
What the ministry holds
The Ministero dell’ambiente e della sicurezza energetica handles the single authorisation for storage of state competence and reports once a year on every procedure. At 30 April 2026 it had 392 storage procedures open for 55.4 GW, against 18 for 1.6 GW at 30 April 2023. A further 45 applications for 12.1 GW were received and not yet opened.
The fifteen largest open procedures:
| Company | Place | MW | Opened | Terna validated |
|---|---|---|---|---|
| Wind Energy & Partners | Brindisi (BR) | 1,000 | 20 December 2024 | |
| EXO S.r.l. | San Severo (FG) | 820 | 4 March 2026 | |
| EXO S.r.l. | San Severo (FG) | 820 | 4 March 2026 | |
| Hammer Bess 01 S.r.l. | Avetrana (TA) | 816 | 4 March 2026 | |
| EG LUCE S.r.l. | Tuscania (VT) | 677 | 22 December 2025 | |
| Aukera Italy 6 | Troia (FG) | 570 | 4 March 2026 | |
| URUS Storage S.r.l. | Macchiareddu (CA) | 479 | 24 April 2024 | yes |
| Rinascita Buonarroti S.r.l. | Castelluccio dei Sauri (FG) | 472 | 4 March 2026 | yes |
| Elements Green Elettra S.r.l. | Sassari (SS) | 456 | 30 April 2025 | |
| Suvereto S.r.l. | Suvereto (LI) | 454 | 4 March 2026 | |
| Rinascita Botticelli S.r.l. | Castel Giorgio (TR) | 435 | 30 April 2025 | yes |
| Bess Lucania S.r.l. | Grottole (MT) | 424 | 23 April 2026 | yes |
| BessTARQ S.r.l. | Tarquinia (VT) | 414 | 23 April 2026 | yes |
| Rinascita Caravaggio S.r.l. | Manciano (GR) | 403 | 23 April 2026 | yes |
| Miura Storage S.r.l. | Bomarzo (VT) | 402 | 13 February 2025 |
Regional authorisations, which cover most projects below the state threshold, are not in this record; the press rows below carry the ones reported. Source: MASE, Rapporto sull’andamento delle autorizzazioni, 2026-04.
Authorised by the regions
Most storage below the state threshold is authorised by a region, and each region publishes its acts its own way. 88 acts and notices are read so far: Sicily’s single-authorisation decrees and the Department of Energy’s public notices, Puglia’s and Lazio’s official bulletins, and one Emilia-Romagna act. A notice marks a procedure opened, never a permit, and is shown as announced. The twenty largest acts:
| Project | Company | Place | MW | MWh | Stage | Act |
|---|---|---|---|---|---|---|
| Montalto BESS 3 (Enel) | Enel | Montalto di Castro (Viterbo) | 491 | — | Authorised | BUR Lazio n. 72 of 8 Sep… |
| Belpasso BESS (X-Elio Athena) | X-Elio | Belpasso (Catania) | 400 | 1,600 | Authorised | Regione Siciliana… |
| BESS Belpasso 200 (Belpasso 2 SPV) | Belpasso 2 SPV Srl (Milan) | Belpasso (Catania) | 200 | 1,600 | Authorised | Regione Siciliana… |
| Masseria Rescio BESS (Sunny) | Sunny Srl (Rome), formerly CFR Srl | Avetrana; Erchie (Taranto) | 199 | — | Authorised | BURP n. 101 of 18 Dec 2025… |
| San Severo Motta della Regina BESS (Eco Wind) | Eco Wind Srl (Rome) | San Severo (Foggia) | 144 | — | Authorised | BURP n. 54 of 9 Jul 2026, Eco… |
| 081PHO Bess (FTV Ruber) | FTV Ruber Srl (Milan, Via San Clemente 1) | Brindisi (Brindisi) | 120 | — | Authorised | BURP n. 71 of 7 Sep 2026, FTV… |
| 069GEO Bess (FTV Nobilis) | FTV Nobilis Srl (Milan, Via San Clemente 1) | Brindisi (Brindisi) | 120 | — | Authorised | BURP n. 91 of 13 Nov 2025… |
| 082GEO Bess (FTV Nobilis) | FTV Nobilis Srl (Milan, Via San Clemente 1) | Brindisi (Brindisi) | 120 | — | Authorised | BURP n. 91 of 13 Nov 2025… |
| Belpasso BESS (RP BESS) | RP BESS Srl (Milan) | Belpasso (Catania) | 113 | 905 | Authorised | Regione Siciliana… |
| BESS Belpasso 100 (Belpasso SPV) | Belpasso SPV Srl (Milan) | Belpasso (Catania) | 100 | 800 | Authorised | Regione Siciliana… |
| Gibellina BESS | Duna Solar Srl (Milan) | Gibellina (Trapani) | 100 | 800 | Authorised | Regione Siciliana… |
| Eraclea Sud BESS (Alpiq) | Alpiq | Cattolica Eraclea; Sant'Angelo Muxaro (Agrigento) | 100 | 400 | Authorised | Regione Siciliana… |
| BELPASSOBESS (Amadeo Solare) | Amadeo Solare Srl (Milan) | Belpasso (Catania) | 100 | 800 | Authorised | Regione Siciliana… |
| Melilli BESS 100 (Cero Project 2) | Cero Italy Projects 2 Srl (Milan) | Melilli (Siracusa) | 100 | 800 | Authorised | Regione Siciliana… |
| Ciminna BESS | Ciminna Energia Srl (Rome) | Ciminna (Palermo) | 100 | — | Authorised | Regione Siciliana… |
| Ragusa BESS 100 (Ragusa BESS Srl) | Ragusa BESS Srl (Camporotondo Etneo) | Ragusa (Ragusa) | 100 | — | Authorised | Regione Siciliana… |
| EDPR BESS Uno | EDP Renewables | Ramacca; Paternò; Belpasso (Catania) | 100 | 800 | Authorised | Regione Siciliana… |
| Trapani BESS 1 (EP Produzione), modification decree | EP Produzione | Misiliscemi (Trapani) | 100 | 200 | Authorised | Regione Siciliana… |
| Sol080 Bess (Apulia Renewable Energy) | Apulia Renewable Energy Srl (Milan, Via San Clemente 1) | Brindisi (Brindisi) | 100 | — | Authorised | BURP n. 71 of 7 Sep 2026… |
| Acate BESS 001 | iCube Development 28 Srl (Milan) | Acate (Ragusa) | 99 | 594 | Authorised | Regione Siciliana… |
Sources: Regione Siciliana decree register and notice lists, BURP (Puglia), BUR Lazio, ARPAE. Sardinia’s bulletin sits behind a login and Lombardy’s provinces publish no register, so those regions are read only through the press.
Authorised by the ministry in the year to 30 April 2026
68 decrees for 5.9 GW. The twenty largest:
| Company | Project | Place | MW | Decree |
|---|---|---|---|---|
| EG Tulipano S.r.l | Fiscaglia (FE) | 486 | 6 November 2025 | |
| BESS BY ERRY S.R.L | Melfi BESS 2 | Melfi (PZ) | 280 | 7 August 2025 |
| ITALY GRID STORAGE ONE S.r.l | Maddaloni | Maddaloni (CE) | 200 | 2 May 2025 |
| ITALY GRID STORAGE TWO S.r.l | Troia (FG) | 200 | 8 July 2025 | |
| BESS FANO S.R.L | Bess Fano | Fano (PU) | 175 | 21 May 2025 |
| Sphera Zefiro S.r.l | Roverella | Tuscania (VT) | 160 | 5 August 2025 |
| EG Orchidea S.r.l | Loreo (RO) | 130 | 11 March 2026 | |
| SPHERA NORDEA S.R.L | BESS Forlì | Forlì (FC) | 120 | 20 May 2025 |
| BESS SESSA AURUNCA S.r.l | Sessa Aurunca (CE) | 120 | 7 August 2025 | |
| ENERGY TOTAL CAPITAL BESS BENEVENTO S.R.L | Benevento (BN) | 120 | 18 August 2025 | |
| DFD Green S.r.l | San Sostene | San Sostene (CZ) | 120 | 25 August 2025 |
| PVEXO APOLLO 2 S.r.l | Fucci BESS | Andria (BT) | 116 | 21 May 2025 |
| SATURN S.R.L | Matera (MT) | 104 | 30 July 2025 | |
| NEOEN RENEWABLES ITALIA S.R.L | Benevento 2 | Benevento (BN) | 103 | 25 August 2025 |
| DL BESS 5 S.R.L | Fontana Rubina 5 | Deliceto (FG) | 101 | 23 December 2025 |
| DL BESS 3 S.R.L | Fontana Rubina 3 | Deliceto (FG) | 101 | 23 December 2025 |
| DL BESS 1 S.r.l | Fontana Rubina 1 | Deliceto (FG) | 101 | 23 December 2025 |
| Solar Challenge 4 S.r.l | Sessa Aurunca (CE) | 100 | 2 May 2025 | |
| HECI HELIOS 2 s.r.l | Adamuccio-Duma | Galatina (LE) | 100 | 10 June 2025 |
| HECI HELIOS 12 s.r.l | Palma | Galatina (LE) | 100 | 10 June 2025 |
Awarded a contract by Terna
The capacity market pays a fixed premium per MW of derated capacity (CDP) for new storage over fifteen years. Four auctions have awarded 1,857 MW CDP to 63 new storage units. MACSE, the storage-only auction, contracts energy capacity in MWh; its first round on 30 settembre 2025 contracted 10.0 GWh in 14 lots for delivery in 2028.
Capacity market premiums
| Delivery year | Auction held | New MW awarded | New, €/MW/year | Existing, €/MW/year |
|---|---|---|---|---|
| 2022 | — | — | — | |
| 2023 | — | — | — | |
| 2024 | 21 febbraio 2022 | 1,504 | 70,000 | 33,000 |
| 2025 | 25-26 luglio 2024 | 174 | 67,500 | 45,000 |
| 2026 | 18 dicembre 2024 | 140 | 56,160 | 46,000 |
| 2027 | 26-27 febbraio 2025 | 594 | 47,000 | 47,000 |
MACSE premiums, €/MWh/year
| Area | Marginal | Weighted average |
|---|---|---|
| Centro Sud | 16,556 | 14,566 |
| Sardegna | 16,557 | 15,029 |
| Sicilia | 18,816 | 15,846 |
| Sud e Calabria | 14,354 | 12,137 |
MACSE lots
| Company | Area | MWh | MW |
|---|---|---|---|
| ENEL PRODUZIONE S.P.A. | Sud e Calabria | 3,636 | 574 |
| ACL SPV 4 SRL | Sud e Calabria | 1,425 | 227 |
| SOLAR CHALLENGE 4 S.R.L. | Centro Sud | 832 | 98 |
| ACL SPV 7 | Sud e Calabria | 706 | 96 |
| ENEL PRODUZIONE S.P.A. | Centro Sud | 595 | 90 |
| V-RIDIUM SOLAR SICILIA 3 S.R.L. | Sud e Calabria | 499 | 62 |
| ENEL PRODUZIONE S.P.A. | Sud e Calabria | 447 | 71 |
| ENEL PRODUZIONE S.P.A. | Centro Sud | 298 | 45 |
| W SELARGIUS | Sardegna | 295 | 41 |
| W BISACCIA | Centro Sud | 275 | 38 |
| ENEL PRODUZIONE S.P.A. | Sud e Calabria | 255 | 38 |
| ENI PLENITUDE STORAGE ITALY S.R.L. | Sicilia | 250 | 42 |
| SCARA ENERGIA SRL | Sicilia | 250 | 35 |
| ENI PLENITUDE STORAGE ITALY S.R.L. | Sardegna | 205 | 34 |
Capacity market storage units
| Delivery | Participant | Unit | Area | MW CDP | Hours |
|---|---|---|---|---|---|
| 2027 | AS STORAGE S.R.L. | RONDISSONE | Nord | 168 | 4.0 |
| 2027 | ENEL PRODUZIONE SPA | LA SPEZIA BESS 2 | Nord | 127 | 4.0 |
| 2027 | ACL SPV 1 | CHIGNOLO PO BESS | Nord | 73 | 4.0 |
| 2027 | LA RICCIA SRL | LA RICCIA | Centro Sud | 66 | 4.0 |
| 2027 | RNE10 S.R.L. | IMPIANTO BESS DI FAUGLIA | Centro Nord | 34 | 4.0 |
| 2027 | ATLAS STORAGE 1 S.R.L. | PASIAN DI PRATO BESS | Nord | 17 | 4.0 |
| 2027 | ATLAS STORAGE 3 S.R.L. | CASTEGNERO BESS | Nord | 17 | 4.0 |
| 2027 | Italian Smart Storage SRL | ISS_CEP2 | Centro Sud | 7 | 4.0 |
| 2027 | Italian Smart Storage SRL | ISS_TOS1 | Sicilia | 7 | 4.0 |
| 2027 | Italian Smart Storage SRL | ISS_DON2 | Sud | 7 | 4.0 |
| 2027 | IGS | CORNEGLIANO_B ESS | Nord | 6 | 4.0 |
| 2027 | Italian Smart Storage SRL | ISS_CAL4 | Sicilia | 6 | 4.0 |
| 2027 | Italian Smart Storage SRL | ISS_CER2 | Nord | 5 | 4.0 |
| 2027 | SUNPRIME AGIRA SRL | SAN SALVO | Centro Sud | 4 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | FERENTINO | Centro Sud | 4 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | TRINO VERCELLESE | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | GEMONA DEL FRIULI - 1 | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | GEMONA DEL FRIULI - 2 | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | SAN GIORGIO CANAVESE - 1 | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | SAN GIORGIO CANAVESE - 2 | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | AIRASCA - 1 | Nord | 2 | 2.0 |
| 2027 | SUNPRIME AGIRA SRL | AIRASCA - 2 | Nord | 2 | 2.0 |
| 2027 | ECO TRADE SRL | SISTEMA DI ACCUMULO SAN SEBASTIANO | Nord | 1 | 2.0 |
| 2026 | EPP4 S.R.L. | TRAPANI BESS 1 | Sicilia | 44 | 4.0 |
| 2026 | MYT APULIA STORAGE 1 S.R.L. | SAN SEVERO STORAGE | Sud | 14 | 3.0 |
| 2026 | NEOEN ENERGIA VERDE 15 | BRONI BESS | Nord | 7 | 4.0 |
| 2026 | MAGNOLIA SOL S.R.L. | LA VIOLA BESS | Centro Sud | 6 | 2.2 |
| 2026 | RESOL GHISLARENGO | ACCUMULO GHISLARENGO | Nord | 5 | 4.0 |
| 2026 | SORGENIA SPA | LODI BESS | Nord | 4 | 4.0 |
| 2026 | SORGENIA SPA | TERMOLI BESS | Sud | 4 | 1.0 |
| 2025 | EP BESS FIUME SANTO SRL | Fiume Santo_BESS_1 | Sardegna | 44 | 2.0 |
| 2025 | EP CENTRALE TAVAZZANO MONTANASO | CEF_BESS | Nord | 31 | 2.0 |
| 2025 | MYT APULIA STORAGE 3 S.R.L. | METKA ERCHIE | Sud | 14 | 3.0 |
| 2024 | ENEL PRODUZIONE SPA | BESS_UDINE_SUD | Nord | 136 | 4.14 |
| 2024 | ENEL PRODUZIONE SPA | BESS_TRINO_2 | Nord | 136 | 4.11 |
| 2024 | ENEL PRODUZIONE SPA | BESS_OTTANA | Sardegna | 135 | 4.04 |
| 2024 | ENEL PRODUZIONE SPA | BESS_PORTOSCUSO | Sardegna | 115 | 4.09 |
| 2024 | ENEL PRODUZIONE SPA | BESS_CODRONGIANOS_2 | Sardegna | 94 | 4.02 |
| 2024 | ENEL PRODUZIONE SPA | BESS_SULCIS | Sardegna | 82 | 4.04 |
| 2024 | ENEL PRODUZIONE SPA | BESS_PIETRAFITTA | Centro Sud | 67 | 4.04 |
| 2024 | ENEL PRODUZIONE SPA | BESS_QUARTUCCIU | Sardegna | 52 | 4.01 |
| 2024 | ENEL PRODUZIONE SPA | BESS_SERRE_TAVAZZANO | Nord | 34 | 4.04 |
| 2024 | ENEL PRODUZIONE SPA | BESS_MONTALTO 1 | Centro Sud | 32 | 4.04 |
| 2024 | ENEL PRODUZIONE SPA | BESS_ASSEMINI | Sardegna | 28 | 4.33 |
| 2024 | ENEL PRODUZIONE SPA | BESS_PORTO_CORSINI | Nord | 23 | 4.24 |
| 2024 | ENEL PRODUZIONE SPA | BESS_CARPI | Nord | 21 | 4.33 |
| 2024 | ENEL PRODUZIONE SPA | BESS_PORTO_TOLLE_2 | Nord | 18 | 4.33 |
| 2024 | IREN ENERGIA SPA | STORAGE OTTANA | Sardegna | 18 | 2.0 |
| 2024 | ENEL PRODUZIONE SPA | BESS_TRINO_1 | Nord | 17 | 4.33 |
| 2024 | ENEL PRODUZIONE SPA | BESS_SANTA_BARBARA | Centro Nord | 14 | 4.33 |
| 2024 | ENEL PRODUZIONE SPA | BESS_ALESSANDRIA_2 | Nord | 14 | 4.33 |
| 2024 | ENEL PRODUZIONE SPA | BESS_FUSINA | Nord | 14 | 4.12 |
| 2024 | ENEL PRODUZIONE SPA | BESS_LA_SPEZIA | Nord | 14 | 4.12 |
| 2024 | STORAGE SYSTEMS S.R.L.S. | BRINDISI | Sud | 11 | 2.0 |
| 2024 | A2A SPA | CHIVASSO BESS | Nord | 9 | 2.0 |
| 2024 | ERG POWER GENERATION S.P.A | BESS VICARI | Sicilia | 8 | 4.0 |
| 2024 | EDISON SPA | BUSSI | Centro Sud | 7 | 4.0 |
| 2024 | ERG POWER GENERATION S.P.A | BESS GINESTRA | Centro Sud | 6 | 4.0 |
| 2024 | ENEL PRODUZIONE SPA | BESS_LA_CASELLA | Nord | 4 | 4.06 |
| 2024 | IREN ENERGIA SPA | STORAGE GUSPINI | Sardegna | 4 | 2.0 |
| 2024 | A2A SPA | GISSI BESS_01 | Centro Sud | 4 | 2.0 |
| 2024 | A2A SPA | GISSI BESS_02 | Centro Sud | 4 | 2.0 |
| 2024 | DEL ENERGY S.R.L. | BESS_LICETO | Sud | 1 | 2.0 |
Terna states no municipality for a unit; where the unit name carries a town the project is placed there. Source: Terna, Rendiconto degli esiti, one report per auction.
Named in press and company statements
224 rows found in company statements, environmental declarations, ministry decrees as reported, Terna statements and the trade press, each with the page it rests on. The forty most advanced:
| Project | Operator | Place | MW | MWh | Stage | Source |
|---|---|---|---|---|---|---|
| Zelestra Emilia-Romagna BESS | Zelestra | Emilia-Romagna | 500 | 2,000 | Announced | Energy-Storage.news |
| Zelestra Friuli-Venezia Giulia BESS | Zelestra | Friuli-Venezia Giulia | 207 | 830 | Announced | Energy-Storage.news |
| Miniera d'Energia (Carbosulcis) | Energy Vault | Sardegna | 100 | — | Announced | Energy Vault project page |
| Camposcala BESS (BNZ) | BNZ | Lazio | — | 240 | Announced | Energy-Storage.news |
| Centro Energia Ferrara BESS | TTEP Italia | Ferrara | — | 140 | Announced | pv magazine Italia |
| Rinaldone BESS (BNZ) | BNZ | Lazio | — | 240 | Announced | Energy-Storage.news |
| Fiscaglia BESS (EG Tulipano) | Fiscaglia | 486 | — | Authorised | MASE, Rapporto andamento… | |
| Melfi BESS 2 | Melfi | 280 | — | Authorised | MASE, Rapporto andamento… | |
| Cumiana BESS | Cumiana; Piossasco | 268 | — | Authorised | pv magazine Italia | |
| Castelverde BESS | Castelverde | 260 | — | Authorised | pv magazine Italia | |
| Valmontone BESS | Valmontone | 250 | — | Authorised | pv magazine Italia | |
| Rotello BESS (FRV) | Rotello | 242 | — | Authorised | pv magazine Italia | |
| Castra energiae tuscanorum | Tuscania | 226 | — | Authorised | pv magazine Italia | |
| ETC SAP BESS | Sant'Agata di Puglia | 222 | — | Authorised | pv magazine Italia | |
| BESS Troia (Italy Grid Storage Two) | Troia | 200 | — | Authorised | MASE, Rapporto andamento… | |
| Maddaloni BESS | Maddaloni | 200 | 800 | Authorised | MASE, Rapporto andamento… | |
| Melfi BESS (Field) | Melfi | 200 | — | Authorised | ESS News | |
| Catapano BESS | Melfi | 198 | — | Authorised | pv magazine Italia | |
| San Severo BESS (Energy Total Capital) | San Severo | 198 | — | Authorised | pv magazine Italia | |
| Rotello BESS 2 (Benny Energia) | Rotello | 188 | — | Authorised | pv magazine Italia | |
| Energy Storage San Vito | Galatina | 180 | — | Authorised | ESS News | |
| Bess Fano | Fano | 175 | — | Authorised | MASE, Rapporto andamento… | |
| Oristano BESS | Oristano | 161 | — | Authorised | pv magazine Italia | |
| Candela Storage (Edison) | Edison | Candela | 160 | — | Authorised | e-gazette |
| Impianto storage Cobalto Ferrara | Ferrara | 160 | — | Authorised | pv magazine Italia | |
| Roverella BESS | Sonnedix | Tuscania | 160 | 640 | Authorised | MASE, Rapporto andamento… |
| Lacchiarella BESS (JBESS) | Lacchiarella; Zibido San Giacomo | 151 | — | Authorised | pv magazine Italia | |
| Collesalvetti BESS (Enfinity) | Collesalvetti | 150 | 600 | Authorised | pv magazine Italia | |
| Picerno BESS (ERG) | ERG | Picerno | 150 | — | Authorised | pv magazine Italia |
| Arcole San Bonifacio BESS (ACL) | Arcole; San Bonifacio | 136 | — | Authorised | ESS News | |
| Loreo BESS (EG Orchidea) | Loreo | 130 | — | Authorised | MASE, Rapporto andamento… | |
| BESS Forlì | Forlì | 120 | — | Authorised | MASE, Rapporto andamento… | |
| Benevento BESS (Energy Total Capital) | Benevento | 120 | — | Authorised | MASE, Rapporto andamento… | |
| San Sostene BESS | San Sostene | 120 | — | Authorised | MASE, Rapporto andamento… | |
| Sessa Aurunca BESS (BESS Sessa Aurunca Srl) | Sessa Aurunca | 120 | — | Authorised | MASE, Rapporto andamento… | |
| Fucci BESS | Andria | 116 | — | Authorised | MASE, Rapporto andamento… | |
| Buja BESS | Gemona del Friuli; Buja | 112 | — | Authorised | pv magazine Italia | |
| Romanazzi BESS | Arcole; San Bonifacio | 108 | — | Authorised | pv magazine Italia | |
| Andria BESS (Engie Storage Negramaro) | Engie Italia | Andria | 104 | — | Authorised | pv magazine Italia |
| Truncu Reale 2 | Sassari | 104 | — | Authorised | pv magazine Italia |
Facts and links only; no article text is reproduced. Where two sources disagree the operator’s figure is kept and the note says so.
How this register is built, and what it cannot say
A project appearing in more than one record is shown once, at its most advanced stage, when the company name and the municipality agree. Where they do not, because a plant changed hands, a record names no municipality or a row copies a line of Terna’s results, the records are joined by hand, and a file in the register’s repository gives the evidence for each join. 134 projects rest on more than one record, 52 of them joined by hand. A capacity market MW is Terna’s derated CDP and is never added to a nameplate MW. A blank MW means no source states it. The ministry’s record covers only authorisations of state competence; the regions grant the rest. Sicily’s decrees and notices, Puglia’s and Lazio’s bulletins and one Emilia-Romagna act are read; Sardinia’s bulletin sits behind a login, Lombardy’s provinces publish no register, and the other regions were searched only through the press. Terna does not publish the applicant behind a queue request, so this register cannot be joined to the Atlas request by request. Enel says 27 battery plants and 1.76 GW operate in Italy and publishes no list. A plant is shown as operating only where a public source says it runs: Enel’s own environmental declarations and statements, its builders, or the press. Where none does, the plant is shown at the last stage a public record supports, usually its contract with Terna, and its record says so. What a project earns is not public in Italy: GME’s market data is licensed for private use only, so no revenue appears here.
Records: MASE authorisation reports (2021-04, 2022-04, 2023-04, 2024-04, 2026-04); Terna capacity market reports, delivery years 2024, 2025, 2026, 2027; Terna MACSE report 2028; press and company statements to 2026-10-07. The register as a file.