Vitreous Labs Ministry report 2026-04 · Terna auctions to 2027 · press to 2026-10-07
Show
CSV

Circle area is the megawatts; colour is how far along

OperatingUnder constructionContract awardedAuthorisedWith the ministryFiled, not yet openedAnnounced
686 of 746 projects placed, at the municipality Terna gives, never the site. Capacity market units are placed where the unit name carries a town.

Italy · projects by name · five public records

The ministry has 55.4 GW of storage waiting for a permit. At 30 April 2023 it had 1.6 GW. 5.9 GW got its decree in the year to 30 April 2026.

Terna’s queue never names a project. These five records do: the ministry’s report on the storage authorisations it handles, the regions’ own authorisation acts and notices, Terna’s capacity market and MACSE auction results, and what developers have said in public. Read together they give 746 named projects, 17 operating and 10 under construction. Every row says which record it rests on. The Atlas has the totals by municipality.

With the ministry55.4GW · 392 procedures
Authorised, year to 20265.9GW · 68 decrees
Capacity market1,857MW CDP · 63 units
MACSE10.0GWh · 14 lots

Showing every named project. Filter by stage, region or record, or search.

The projects, most advanced first

Click a row to centre the map there. MW is the developer’s or the ministry’s nominal figure; for a capacity market unit with no other record it is Terna’s CDP, a derated figure.

ProjectCompanyPlaceMWMWhStage
Udine BESS 1 (Udine Sud)Enel Libra FlexsysPavia di Udine204805Operating
Codrongianos BESS 2Enel Libra FlexsysPloaghe138—Operating
Pietrafitta BESSEnel Libra FlexsysPiegaro100400Operating
La Casella BESSEnel Libra FlexsysCastel San Giovanni70340Operating
Serre Tavazzano BESSEnel Libra FlexsysTavazzano Con Villavesco50—Operating
Montalto BESS 1Enel Libra FlexsysMontalto di Castro44176Operating
Porto Corsini BESSEnel Libra FlexsysRavenna34—Operating
Torrevaldaliga Nord ESS 2, 3 and 4EnelCivitavecchia27—Operating
Erchie BESSMetlenErchie2575Operating
Trino BESS 1 (Trino solar park and storage)Enel Green PowerTrino25100Operating
Nera Montoro BESS (Engie)Engie ItaliaNarni2529Operating
Fusina BESS 1Enel Libra FlexsysVenezia19—Operating
Assemini BESS (Plenitude)Eni PlenitudeAssemini159Operating
Montalto La Viola BESSRecurrent EnergyMontalto di Castro1443Operating
Salemi BESS (Engie)Engie ItaliaSalemi1214Operating
Vicari BESS (ERG)ERGVicari1250Operating
Chivasso BESS (A2A)A2AChivasso——Operating
Ottana BESSEnelOttana200—Under construction
Quartucciu BESSEnel Libra FlexsysQuartucciu180—Under construction
Chignolo Po BESSBW ESSChignolo Po107515Under construction
Fiume Santo BESS 1TTEP Italia (formerly EP Produzione)Sardegna100200Under construction
Cerignola BESS (ACL SPV 7, BW ESS)ACL SPV 7 Srl (BW ESS and ACL Energy)Cerignola97828Under construction
Porto Tolle BESS 2EnelPorto Tolle25100Under construction
Pasian di Prato BESS (Neoen)NeoenPasian di Prato25100Under construction
Carpi BESS 1EnelCarpi21—Under construction
Bertonico BESS (Sorgenia)SorgeniaBertonico15—Under construction
Broni BESS (Neoen, construction)NeoenBroni1051Under construction
Enel Produzione MACSE lot 7 (Sud e Calabria)Enel ProduzioneSud e Calabria5743,636Contract awarded
Rondissone BESSAer SoléirRondissone2501,000Contract awarded
ACL SPV 4 (MACSE, Sud e Calabria)ACL SPV 4 Srl (ACL Energy; reported acquired by Enel)Sud e Calabria2271,425Contract awarded
What the ministry holds

The Ministero dell’ambiente e della sicurezza energetica handles the single authorisation for storage of state competence and reports once a year on every procedure. At 30 April 2026 it had 392 storage procedures open for 55.4 GW, against 18 for 1.6 GW at 30 April 2023. A further 45 applications for 12.1 GW were received and not yet opened.

30 April 202318 procedures1.6 GW
30 April 202481 procedures7.3 GW
30 April 2026392 procedures55.3 GW

The fifteen largest open procedures:

CompanyPlaceMWOpenedTerna validated
Wind Energy & PartnersBrindisi (BR)1,00020 December 2024
EXO S.r.l.San Severo (FG)8204 March 2026
EXO S.r.l.San Severo (FG)8204 March 2026
Hammer Bess 01 S.r.l.Avetrana (TA)8164 March 2026
EG LUCE S.r.l.Tuscania (VT)67722 December 2025
Aukera Italy 6Troia (FG)5704 March 2026
URUS Storage S.r.l.Macchiareddu (CA)47924 April 2024yes
Rinascita Buonarroti S.r.l.Castelluccio dei Sauri (FG)4724 March 2026yes
Elements Green Elettra S.r.l.Sassari (SS)45630 April 2025
Suvereto S.r.l.Suvereto (LI)4544 March 2026
Rinascita Botticelli S.r.l.Castel Giorgio (TR)43530 April 2025yes
Bess Lucania S.r.l.Grottole (MT)42423 April 2026yes
BessTARQ S.r.l.Tarquinia (VT)41423 April 2026yes
Rinascita Caravaggio S.r.l.Manciano (GR)40323 April 2026yes
Miura Storage S.r.l.Bomarzo (VT)40213 February 2025

Regional authorisations, which cover most projects below the state threshold, are not in this record; the press rows below carry the ones reported. Source: MASE, Rapporto sull’andamento delle autorizzazioni, 2026-04.

Authorised by the regions

Most storage below the state threshold is authorised by a region, and each region publishes its acts its own way. 88 acts and notices are read so far: Sicily’s single-authorisation decrees and the Department of Energy’s public notices, Puglia’s and Lazio’s official bulletins, and one Emilia-Romagna act. A notice marks a procedure opened, never a permit, and is shown as announced. The twenty largest acts:

ProjectCompanyPlaceMWMWhStageAct
Montalto BESS 3 (Enel)EnelMontalto di Castro (Viterbo)491—AuthorisedBUR Lazio n. 72 of 8 Sep…
Belpasso BESS (X-Elio Athena)X-ElioBelpasso (Catania)4001,600AuthorisedRegione Siciliana…
BESS Belpasso 200 (Belpasso 2 SPV)Belpasso 2 SPV Srl (Milan)Belpasso (Catania)2001,600AuthorisedRegione Siciliana…
Masseria Rescio BESS (Sunny)Sunny Srl (Rome), formerly CFR SrlAvetrana; Erchie (Taranto)199—AuthorisedBURP n. 101 of 18 Dec 2025…
San Severo Motta della Regina BESS (Eco Wind)Eco Wind Srl (Rome)San Severo (Foggia)144—AuthorisedBURP n. 54 of 9 Jul 2026, Eco…
081PHO Bess (FTV Ruber)FTV Ruber Srl (Milan, Via San Clemente 1)Brindisi (Brindisi)120—AuthorisedBURP n. 71 of 7 Sep 2026, FTV…
069GEO Bess (FTV Nobilis)FTV Nobilis Srl (Milan, Via San Clemente 1)Brindisi (Brindisi)120—AuthorisedBURP n. 91 of 13 Nov 2025…
082GEO Bess (FTV Nobilis)FTV Nobilis Srl (Milan, Via San Clemente 1)Brindisi (Brindisi)120—AuthorisedBURP n. 91 of 13 Nov 2025…
Belpasso BESS (RP BESS)RP BESS Srl (Milan)Belpasso (Catania)113905AuthorisedRegione Siciliana…
BESS Belpasso 100 (Belpasso SPV)Belpasso SPV Srl (Milan)Belpasso (Catania)100800AuthorisedRegione Siciliana…
Gibellina BESSDuna Solar Srl (Milan)Gibellina (Trapani)100800AuthorisedRegione Siciliana…
Eraclea Sud BESS (Alpiq)AlpiqCattolica Eraclea; Sant'Angelo Muxaro (Agrigento)100400AuthorisedRegione Siciliana…
BELPASSOBESS (Amadeo Solare)Amadeo Solare Srl (Milan)Belpasso (Catania)100800AuthorisedRegione Siciliana…
Melilli BESS 100 (Cero Project 2)Cero Italy Projects 2 Srl (Milan)Melilli (Siracusa)100800AuthorisedRegione Siciliana…
Ciminna BESSCiminna Energia Srl (Rome)Ciminna (Palermo)100—AuthorisedRegione Siciliana…
Ragusa BESS 100 (Ragusa BESS Srl)Ragusa BESS Srl (Camporotondo Etneo)Ragusa (Ragusa)100—AuthorisedRegione Siciliana…
EDPR BESS UnoEDP RenewablesRamacca; Paternò; Belpasso (Catania)100800AuthorisedRegione Siciliana…
Trapani BESS 1 (EP Produzione), modification decreeEP ProduzioneMisiliscemi (Trapani)100200AuthorisedRegione Siciliana…
Sol080 Bess (Apulia Renewable Energy)Apulia Renewable Energy Srl (Milan, Via San Clemente 1)Brindisi (Brindisi)100—AuthorisedBURP n. 71 of 7 Sep 2026…
Acate BESS 001iCube Development 28 Srl (Milan)Acate (Ragusa)99594AuthorisedRegione Siciliana…

Sources: Regione Siciliana decree register and notice lists, BURP (Puglia), BUR Lazio, ARPAE. Sardinia’s bulletin sits behind a login and Lombardy’s provinces publish no register, so those regions are read only through the press.

Authorised by the ministry in the year to 30 April 2026

68 decrees for 5.9 GW. The twenty largest:

CompanyProjectPlaceMWDecree
EG Tulipano S.r.lFiscaglia (FE)4866 November 2025
BESS BY ERRY S.R.LMelfi BESS 2Melfi (PZ)2807 August 2025
ITALY GRID STORAGE ONE S.r.lMaddaloniMaddaloni (CE)2002 May 2025
ITALY GRID STORAGE TWO S.r.lTroia (FG)2008 July 2025
BESS FANO S.R.LBess FanoFano (PU)17521 May 2025
Sphera Zefiro S.r.lRoverellaTuscania (VT)1605 August 2025
EG Orchidea S.r.lLoreo (RO)13011 March 2026
SPHERA NORDEA S.R.LBESS ForlìForlì (FC)12020 May 2025
BESS SESSA AURUNCA S.r.lSessa Aurunca (CE)1207 August 2025
ENERGY TOTAL CAPITAL BESS BENEVENTO S.R.LBenevento (BN)12018 August 2025
DFD Green S.r.lSan SosteneSan Sostene (CZ)12025 August 2025
PVEXO APOLLO 2 S.r.lFucci BESSAndria (BT)11621 May 2025
SATURN S.R.LMatera (MT)10430 July 2025
NEOEN RENEWABLES ITALIA S.R.LBenevento 2Benevento (BN)10325 August 2025
DL BESS 5 S.R.LFontana Rubina 5Deliceto (FG)10123 December 2025
DL BESS 3 S.R.LFontana Rubina 3Deliceto (FG)10123 December 2025
DL BESS 1 S.r.lFontana Rubina 1Deliceto (FG)10123 December 2025
Solar Challenge 4 S.r.lSessa Aurunca (CE)1002 May 2025
HECI HELIOS 2 s.r.lAdamuccio-DumaGalatina (LE)10010 June 2025
HECI HELIOS 12 s.r.lPalmaGalatina (LE)10010 June 2025
Awarded a contract by Terna

The capacity market pays a fixed premium per MW of derated capacity (CDP) for new storage over fifteen years. Four auctions have awarded 1,857 MW CDP to 63 new storage units. MACSE, the storage-only auction, contracts energy capacity in MWh; its first round on 30 settembre 2025 contracted 10.0 GWh in 14 lots for delivery in 2028.

Capacity market premiums

Delivery yearAuction heldNew MW awardedNew, €/MW/yearExisting, €/MW/year
2022———
2023———
202421 febbraio 20221,50470,00033,000
202525-26 luglio 202417467,50045,000
202618 dicembre 202414056,16046,000
202726-27 febbraio 202559447,00047,000

MACSE premiums, €/MWh/year

AreaMarginalWeighted average
Centro Sud16,55614,566
Sardegna16,55715,029
Sicilia18,81615,846
Sud e Calabria14,35412,137

MACSE lots

CompanyAreaMWhMW
ENEL PRODUZIONE S.P.A.Sud e Calabria3,636574
ACL SPV 4 SRLSud e Calabria1,425227
SOLAR CHALLENGE 4 S.R.L.Centro Sud83298
ACL SPV 7Sud e Calabria70696
ENEL PRODUZIONE S.P.A.Centro Sud59590
V-RIDIUM SOLAR SICILIA 3 S.R.L.Sud e Calabria49962
ENEL PRODUZIONE S.P.A.Sud e Calabria44771
ENEL PRODUZIONE S.P.A.Centro Sud29845
W SELARGIUSSardegna29541
W BISACCIACentro Sud27538
ENEL PRODUZIONE S.P.A.Sud e Calabria25538
ENI PLENITUDE STORAGE ITALY S.R.L.Sicilia25042
SCARA ENERGIA SRLSicilia25035
ENI PLENITUDE STORAGE ITALY S.R.L.Sardegna20534

Capacity market storage units

DeliveryParticipantUnitAreaMW CDPHours
2027AS STORAGE S.R.L.RONDISSONENord1684.0
2027ENEL PRODUZIONE SPALA SPEZIA BESS 2Nord1274.0
2027ACL SPV 1CHIGNOLO PO BESSNord734.0
2027LA RICCIA SRLLA RICCIACentro Sud664.0
2027RNE10 S.R.L.IMPIANTO BESS DI FAUGLIACentro Nord344.0
2027ATLAS STORAGE 1 S.R.L.PASIAN DI PRATO BESSNord174.0
2027ATLAS STORAGE 3 S.R.L.CASTEGNERO BESSNord174.0
2027Italian Smart Storage SRLISS_CEP2Centro Sud74.0
2027Italian Smart Storage SRLISS_TOS1Sicilia74.0
2027Italian Smart Storage SRLISS_DON2Sud74.0
2027IGSCORNEGLIANO_B ESSNord64.0
2027Italian Smart Storage SRLISS_CAL4Sicilia64.0
2027Italian Smart Storage SRLISS_CER2Nord54.0
2027SUNPRIME AGIRA SRLSAN SALVOCentro Sud42.0
2027SUNPRIME AGIRA SRLFERENTINOCentro Sud42.0
2027SUNPRIME AGIRA SRLTRINO VERCELLESENord22.0
2027SUNPRIME AGIRA SRLGEMONA DEL FRIULI - 1Nord22.0
2027SUNPRIME AGIRA SRLGEMONA DEL FRIULI - 2Nord22.0
2027SUNPRIME AGIRA SRLSAN GIORGIO CANAVESE - 1Nord22.0
2027SUNPRIME AGIRA SRLSAN GIORGIO CANAVESE - 2Nord22.0
2027SUNPRIME AGIRA SRLAIRASCA - 1Nord22.0
2027SUNPRIME AGIRA SRLAIRASCA - 2Nord22.0
2027ECO TRADE SRLSISTEMA DI ACCUMULO SAN SEBASTIANONord12.0
2026EPP4 S.R.L.TRAPANI BESS 1Sicilia444.0
2026MYT APULIA STORAGE 1 S.R.L.SAN SEVERO STORAGESud143.0
2026NEOEN ENERGIA VERDE 15BRONI BESSNord74.0
2026MAGNOLIA SOL S.R.L.LA VIOLA BESSCentro Sud62.2
2026RESOL GHISLARENGOACCUMULO GHISLARENGONord54.0
2026SORGENIA SPALODI BESSNord44.0
2026SORGENIA SPATERMOLI BESSSud41.0
2025EP BESS FIUME SANTO SRLFiume Santo_BESS_1Sardegna442.0
2025EP CENTRALE TAVAZZANO MONTANASOCEF_BESSNord312.0
2025MYT APULIA STORAGE 3 S.R.L.METKA ERCHIESud143.0
2024ENEL PRODUZIONE SPABESS_UDINE_SUDNord1364.14
2024ENEL PRODUZIONE SPABESS_TRINO_2Nord1364.11
2024ENEL PRODUZIONE SPABESS_OTTANASardegna1354.04
2024ENEL PRODUZIONE SPABESS_PORTOSCUSOSardegna1154.09
2024ENEL PRODUZIONE SPABESS_CODRONGIANOS_2Sardegna944.02
2024ENEL PRODUZIONE SPABESS_SULCISSardegna824.04
2024ENEL PRODUZIONE SPABESS_PIETRAFITTACentro Sud674.04
2024ENEL PRODUZIONE SPABESS_QUARTUCCIUSardegna524.01
2024ENEL PRODUZIONE SPABESS_SERRE_TAVAZZANONord344.04
2024ENEL PRODUZIONE SPABESS_MONTALTO 1Centro Sud324.04
2024ENEL PRODUZIONE SPABESS_ASSEMINISardegna284.33
2024ENEL PRODUZIONE SPABESS_PORTO_CORSININord234.24
2024ENEL PRODUZIONE SPABESS_CARPINord214.33
2024ENEL PRODUZIONE SPABESS_PORTO_TOLLE_2Nord184.33
2024IREN ENERGIA SPASTORAGE OTTANASardegna182.0
2024ENEL PRODUZIONE SPABESS_TRINO_1Nord174.33
2024ENEL PRODUZIONE SPABESS_SANTA_BARBARACentro Nord144.33
2024ENEL PRODUZIONE SPABESS_ALESSANDRIA_2Nord144.33
2024ENEL PRODUZIONE SPABESS_FUSINANord144.12
2024ENEL PRODUZIONE SPABESS_LA_SPEZIANord144.12
2024STORAGE SYSTEMS S.R.L.S.BRINDISISud112.0
2024A2A SPACHIVASSO BESSNord92.0
2024ERG POWER GENERATION S.P.ABESS VICARISicilia84.0
2024EDISON SPABUSSICentro Sud74.0
2024ERG POWER GENERATION S.P.ABESS GINESTRACentro Sud64.0
2024ENEL PRODUZIONE SPABESS_LA_CASELLANord44.06
2024IREN ENERGIA SPASTORAGE GUSPINISardegna42.0
2024A2A SPAGISSI BESS_01Centro Sud42.0
2024A2A SPAGISSI BESS_02Centro Sud42.0
2024DEL ENERGY S.R.L.BESS_LICETOSud12.0

Terna states no municipality for a unit; where the unit name carries a town the project is placed there. Source: Terna, Rendiconto degli esiti, one report per auction.

Named in press and company statements

224 rows found in company statements, environmental declarations, ministry decrees as reported, Terna statements and the trade press, each with the page it rests on. The forty most advanced:

ProjectOperatorPlaceMWMWhStageSource
Zelestra Emilia-Romagna BESSZelestraEmilia-Romagna5002,000AnnouncedEnergy-Storage.news
Zelestra Friuli-Venezia Giulia BESSZelestraFriuli-Venezia Giulia207830AnnouncedEnergy-Storage.news
Miniera d'Energia (Carbosulcis)Energy VaultSardegna100—AnnouncedEnergy Vault project page
Camposcala BESS (BNZ)BNZLazio—240AnnouncedEnergy-Storage.news
Centro Energia Ferrara BESSTTEP ItaliaFerrara—140Announcedpv magazine Italia
Rinaldone BESS (BNZ)BNZLazio—240AnnouncedEnergy-Storage.news
Fiscaglia BESS (EG Tulipano)Fiscaglia486—AuthorisedMASE, Rapporto andamento…
Melfi BESS 2Melfi280—AuthorisedMASE, Rapporto andamento…
Cumiana BESSCumiana; Piossasco268—Authorisedpv magazine Italia
Castelverde BESSCastelverde260—Authorisedpv magazine Italia
Valmontone BESSValmontone250—Authorisedpv magazine Italia
Rotello BESS (FRV)Rotello242—Authorisedpv magazine Italia
Castra energiae tuscanorumTuscania226—Authorisedpv magazine Italia
ETC SAP BESSSant'Agata di Puglia222—Authorisedpv magazine Italia
BESS Troia (Italy Grid Storage Two)Troia200—AuthorisedMASE, Rapporto andamento…
Maddaloni BESSMaddaloni200800AuthorisedMASE, Rapporto andamento…
Melfi BESS (Field)Melfi200—AuthorisedESS News
Catapano BESSMelfi198—Authorisedpv magazine Italia
San Severo BESS (Energy Total Capital)San Severo198—Authorisedpv magazine Italia
Rotello BESS 2 (Benny Energia)Rotello188—Authorisedpv magazine Italia
Energy Storage San VitoGalatina180—AuthorisedESS News
Bess FanoFano175—AuthorisedMASE, Rapporto andamento…
Oristano BESSOristano161—Authorisedpv magazine Italia
Candela Storage (Edison)EdisonCandela160—Authorisede-gazette
Impianto storage Cobalto FerraraFerrara160—Authorisedpv magazine Italia
Roverella BESSSonnedixTuscania160640AuthorisedMASE, Rapporto andamento…
Lacchiarella BESS (JBESS)Lacchiarella; Zibido San Giacomo151—Authorisedpv magazine Italia
Collesalvetti BESS (Enfinity)Collesalvetti150600Authorisedpv magazine Italia
Picerno BESS (ERG)ERGPicerno150—Authorisedpv magazine Italia
Arcole San Bonifacio BESS (ACL)Arcole; San Bonifacio136—AuthorisedESS News
Loreo BESS (EG Orchidea)Loreo130—AuthorisedMASE, Rapporto andamento…
BESS ForlìForlì120—AuthorisedMASE, Rapporto andamento…
Benevento BESS (Energy Total Capital)Benevento120—AuthorisedMASE, Rapporto andamento…
San Sostene BESSSan Sostene120—AuthorisedMASE, Rapporto andamento…
Sessa Aurunca BESS (BESS Sessa Aurunca Srl)Sessa Aurunca120—AuthorisedMASE, Rapporto andamento…
Fucci BESSAndria116—AuthorisedMASE, Rapporto andamento…
Buja BESSGemona del Friuli; Buja112—Authorisedpv magazine Italia
Romanazzi BESSArcole; San Bonifacio108—Authorisedpv magazine Italia
Andria BESS (Engie Storage Negramaro)Engie ItaliaAndria104—Authorisedpv magazine Italia
Truncu Reale 2Sassari104—Authorisedpv magazine Italia

Facts and links only; no article text is reproduced. Where two sources disagree the operator’s figure is kept and the note says so.

How this register is built, and what it cannot say

A project appearing in more than one record is shown once, at its most advanced stage, when the company name and the municipality agree. Where they do not, because a plant changed hands, a record names no municipality or a row copies a line of Terna’s results, the records are joined by hand, and a file in the register’s repository gives the evidence for each join. 134 projects rest on more than one record, 52 of them joined by hand. A capacity market MW is Terna’s derated CDP and is never added to a nameplate MW. A blank MW means no source states it. The ministry’s record covers only authorisations of state competence; the regions grant the rest. Sicily’s decrees and notices, Puglia’s and Lazio’s bulletins and one Emilia-Romagna act are read; Sardinia’s bulletin sits behind a login, Lombardy’s provinces publish no register, and the other regions were searched only through the press. Terna does not publish the applicant behind a queue request, so this register cannot be joined to the Atlas request by request. Enel says 27 battery plants and 1.76 GW operate in Italy and publishes no list. A plant is shown as operating only where a public source says it runs: Enel’s own environmental declarations and statements, its builders, or the press. Where none does, the plant is shown at the last stage a public record supports, usually its contract with Terna, and its record says so. What a project earns is not public in Italy: GME’s market data is licensed for private use only, so no revenue appears here.

Records: MASE authorisation reports (2021-04, 2022-04, 2023-04, 2024-04, 2026-04); Terna capacity market reports, delivery years 2024, 2025, 2026, 2027; Terna MACSE report 2028; press and company statements to 2026-10-07. The register as a file.