36 MW, about 36 MWh (1 hour, from the capacity market de-rating class) in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 16 October 2026, or is labelled as an estimate.

What it is

Registered power36 MW balancing mechanism registration
Storage duration1 hour capacity market de-rating class
Charging zoneMid Wales and The Midlands
Connection siteBedford
PostcodeMK45
Balancing mechanism unitE_GRFLB-1

Who owns it and who trades it

Traded byCONRAD ENERGY (TRADING) LIMITEDruns several sitesconfirmed, Elexon's register
Owned byCONRAD (FLITWICK) LIMITED
Owner established fromcapacity market registered holder
UltimatelyConrad Energy confirmed source

How we know. The control filing on Conrad (Blackpool) Limited runs to Conrad (Glyme) Limited and, before July 2023, Conrad Energy (Holdings) II Limited. The sibling companies share the same Abingdon registered office.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it earned

Line364 days to 16 October 2026
Balancing mechanism£4k
Response and reserve auctions auction implied£266k
Capacity market£306k
Three lines together£577k

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 4,320 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 3 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 359 days to 11 October 2026, 45 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out9,605 MWh
Metered import, what crossed the meter in12,431 MWh
Equivalent full cycles, everything sent out over one full charge267 over 359 days, 271 a year at that rate
Apparent meter to meter efficiency77%, plausible: losses plus a standing load that is material against a modest throughput
Balancing offers accepted0 MWh
Balancing bids accepted0 MWh
Position outside balancing, export9,605 MWh
Position outside balancing, import12,431 MWh
Of which expected response delivery, net91 MWh 428 out, 337 in
Traded position, net−2,916 MWh 9,440 out, 12,356 in
Traded position at the market index, sold£1.2m
Traded position at the market index, bought£1.0m
Traded position, net, at the index£138k
Response delivery, net, at the imbalance price£4k £7k at the index
Balancing and outside balancing together£142k £4.01/kW/yr

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £97.34. What it sent out was worth £123.29 a megawatt hour at that same index, 1.27 times the average. What it took in was worth £83.05, 0.85 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.

Where it stands

All three measured lineswhole fleet, £/kW/yr28th percentile230 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Maldon361h£107.5/kW/yr
Port of Tyne Energy Storage350.7h£63.0/kW/yr
Fareham Reserve 2361h£44.5/kW/yr
Rusholme351.5h£34.9/kW/yr
Potmans Lane351h£27.8/kW/yr
Conrad (FLITWICK)this battery361h£16.1/kW/yr