Vitreous LabsEnergy transparency
Great Britain · the operating fleet

Pen y Cymoedd Battery

22 MW in South Wales and Gloucester. Everything on this page is read from published data for the 364 days to 16 October 2026, or is labelled as an estimate.

What it is

Registered power22 MW balancing mechanism registration
Charging zoneSouth Wales and Gloucester
Connection siteRhondda Cynon Taf
PostcodeCF42 5SX
Balancing mechanism unitT_PNYCB-1

Who owns it and who trades it

Traded byArenko Cleantech Limitedruns several sitesconfirmed, Elexon's register
Owned bynot published anywhere we can read
UltimatelyVattenfall confirmed source

How we know. The register names no owner. The capacity market holds a site called Battery@PyC belonging to Vattenfall AB, and the battery sits at Vattenfall's Pen y Cymoedd wind farm.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it is built from

Battery systemBMW automotive lithium ion packs (i3 technology) with a BMW designed management system; integrator not named
Entered operation2017 to 2018 (battery works from July 2017 after the wind farm reached full output in May 2017)
Container countup to 1,000 battery packs

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed. Checked 2026-08-31. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.

What it earned

Line364 days to 16 October 2026
Balancing mechanism£17k
Response and reserve auctions auction implied£967
Capacity marketno agreement we can attach
Three lines together£18k

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 96 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 359 days to 11 October 2026, 45 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out152 MWh
Metered import, what crossed the meter in330 MWh
Equivalent full cycles, everything sent out over one full charge·
Apparent meter to meter efficiency46%, not ordinary battery losses alone
Balancing offers accepted254 MWh
Balancing bids accepted135 MWh
Position outside balancing, export100 MWh
Position outside balancing, import397 MWh
Of which expected response delivery, net0 MWh 2 out, 2 in
Traded position, net−297 MWh 102 out, 399 in
Traded position at the market index, sold£7k
Traded position at the market index, bought£28k
Traded position, net, at the index−£21k
Response delivery, net, at the imbalance price−£6 −£10 at the index
Balancing and outside balancing together−£4k £-0.20/kW/yr

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £97.34. What it sent out was worth £64.53 a megawatt hour at that same index, 0.66 times the average. What it took in was worth £70.00, 0.72 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

What it paid to buy energy back

When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 135 MWh of accepted bids it paid an average of £43.45 a megawatt hour. The market index averaged £63.14 across those same half hours, so it bought back at £19.69 a megawatt hour below the going price.

Price it paidVolumeAverageCash
below zero13 MWh−£9.18£121 received
£0 to £2520 MWh£10.55£211
£25 to £5026 MWh£41.60£1k
£50 to £7574 MWh£61.39£5k
£75 to £1002 MWh£76.73£173

On 13 MWh the price was below zero: NESO paid this unit an average of £9.18 a megawatt hour to take energy, £121 in all. That is a constrained network with more generation on it than it can move.

The other direction, offers, is much smaller here: 254 MWh where NESO asked for more, paid at an average of £89.89 against an index of £63.07.

Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.

  • returns only 46% of what it takes in, with 152 MWh exported all year, about 7 full power hours: a unit that barely cycles, where its own standing consumption and losses dominate a small throughput

Where it stands

Balancing incomewhole fleet, £/kW/yr3rd percentile100 units
Balancing incomeEngland and Wales peer group3rd percentile72 units
All three measured lineswhole fleet, £/kW/yr9th percentile230 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. How long this battery can run for is not published, so duration is not used to choose them. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Equinor Blandford Road231.5h£134.3/kW/yr
Rhondda Cynon Taf (HIRWB-1)21not known£128.7/kW/yr
Torquay222h£28.2/kW/yr
Pulse Clean (HAB12-FFR)211h£16.8/kW/yr
Pulse Clean (HAB13-FFR)211h£13.1/kW/yr
Pen y Cymoedd Batterythis battery22not known£0.8/kW/yr

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.