Burwell Weirs Drove BESS
50 MW in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 16 October 2026, or is labelled as an estimate.
What it is
| Registered power | 50 MW balancing mechanism registration |
| Charging zone | Mid Wales and The Midlands |
| Postcode | CB25 |
| Balancing mechanism unit | E_BURWB-1 |
Who owns it and who trades it
| Traded by | Arenko Cleantech Limitedruns several sitesconfirmed, Elexon's register |
| Owned by | not published anywhere we can read |
| Ultimately | Voltwise Power (Sandbrook Capital) confirmed source |
How we know. The register names no owner. The capacity market holds a site called BURWB1 belonging to Voltwise Power Holdings Limited, which is this unit's own balancing code, and Burwell Weirs Drove is a two phase Voltwise site of about 126 MW operated by Ethical Power.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 16 October 2026 |
|---|---|
| Balancing mechanism | £2k |
| Response and reserve auctions auction implied | £0 |
| Capacity market | no agreement we can attach |
| Three lines together | £2k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held no frequency response contract in the window, so the whole position is treated as traded. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 24 days to 10 November 2025. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 0 MWh |
| Metered import, what crossed the meter in | 0 MWh |
| Equivalent full cycles, everything sent out over one full charge | · |
| Apparent meter to meter efficiency | · |
| Balancing offers accepted | 0 MWh |
| Balancing bids accepted | 0 MWh |
| Position outside balancing, export | 0 MWh |
| Position outside balancing, import | 0 MWh |
| Valued at the market index, sold | £0 |
| Valued at the market index, bought | £0 |
| Outside balancing, net, at the index | £0 |
| Balancing and outside balancing together | £0 £0.00/kW/yr |
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- only 24 of 364 days metered
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. How long this battery can run for is not published, so duration is not used to choose them. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Grendon | 50 | 2h | £89.2/kW/yr |
| Creyke Beck | 50 | not known | £74.5/kW/yr |
| Sundon BESS | 50 | 2h | £68.7/kW/yr |
| Pivot Power Coventry | 50 | 2h | £59.5/kW/yr |
| Chapel Farm BESS | 50 | 1.5h | £39.4/kW/yr |
| Burwell Weirs Drove BESSthis battery | 50 | not known | £0.0/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.