Circle area is the megawatts
Finland · the batteries their owners name · Fingrid’s count of 18 October 2026
2,057 MW of batteries are connected in Finland by Fingrid’s own count. Their owners name 24 of them, 457 MW, and 1,600 MW more being built.
No Finnish body publishes a list of the batteries on the grid. Fingrid, the system operator, counts them and publishes the total, hourly; the Energy Authority’s register of power plants holds no battery. So this map is the batteries their owners and builders have named in their own releases and in council and permit papers: 89 of them, every fact with its source beside it. 24 are operating (one of them energised and commissioning), 31 are being built and 34 are announced. The 24 operating hold 457 MW, about 22% of Fingrid’s count; the rest of the count has no name in any owner’s release. There is no queue to draw: Fingrid says more than 30 GW of storage has asked to connect and about 1.8 GW holds a contract (26 September 2025), and names none of it. The Finland page reads Fingrid’s count and the reserve markets; every named battery has a page.
Showing every battery the list names. Filter by status or owner, or search a battery, an owner, a builder or a place.
Every battery named, a megawatt and up
Largest first. Click a row to centre the map on the battery, or open its page for every fact and its source. Power and capacity are as the owner or builder stated them; the date is the owner’s stated start, actual for an operating battery and expected for the rest. A blank means no source gave it; a battery whose owner has given no size is listed at nought and says so.
| Battery | Owner | Municipality | Status | MW | MWh | Date |
|---|
Source: fi/hand/batteries.csv, the list Vitreous keeps by hand from owners’, developers’ and builders’ own releases, council decisions and permit bulletins, checked against the owners’ own words on 12 October 2026; the web address behind every fact is on each battery’s page. Fingrid’s count is its dataset 424, read 18 October 2026, CC BY 4.0. Places from GeoNames, CC BY 4.0. The shaded zones are traced from Fingrid’s connection-application map valid from 1 June 2026, fitted to the coast to within about a kilometre; Fingrid’s own edges are rough. Nothing on this page is modelled, and nothing is a connection queue: Fingrid publishes none.