Simo, phase 2
Being built, 70 MW · 140 MWh, in Simo, owned by FRV with AMP Tank. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 70 MW |
| Capacity | 140 MWh |
| Duration | 2.0 hours |
| Status | Being built, as of 12 October 2026 |
| Owner’s date | 2026, expected |
| Municipality | Simo |
| Grid connection | Near Fingrid Simojoki substation |
| Placed on the map | at the centre of Simo, its municipality (GeoNames) |
Who is behind it
| Owner | FRV with AMP Tank |
| Built by | Huawei (34 LUNA battery containers) |
Not published anywhere we have found: ultimate owner, developer, cells. The page says so rather than guessing.
What the sources say
FRV's Simo page (read 12 Oct 2026): in 2025 FRV signed an extension of 70 MW / 140 MWh, 34 Huawei Luna containers; the page gives the project as "In construction" with operation in 2026, without splitting by phase. Phase 1 was reported deployed in May 2025, so that status is taken to apply to phase 2 (an inference; status was "planned"). Note 18 Oct 2026: the stated date has passed or is passing with no word from the owner that the battery runs; FRV's project page still says "In construction", operation "2026".
Evidence and sources
From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B048.